中科混凝土搅拌机的规范操作你了解吗?
如何规范中科混凝土搅拌机的操作?混凝土搅拌机的准备
How to standardize the operation of concrete mixers in Zhongke? Preparation of concrete mixers
1.检查搅拌机是否稳定,四个支撑腿是否牢固;
1. Check whether the mixer is stable and whether the four support legs are firm;
2.机器运转是否正常;
2. Whether the machine operates normally;
3.水泵注分流水,试车一次;
3. The water pump shall be injected with separate water and tested once;
4.检查电器的接地。
4. Check the grounding of electrical appliances.
二、混凝土搅拌机的使用要求
2、 Requirements for use of concrete mixer
1.每次添加的混合料不得超过规定值,料斗必须在混合完成后才能抬起进料;
1. The mixture added each time shall not exceed the specified value, and the hopper can only lift the feed after mixing;
2.滚筒反转时千万不要提起手柄;
2. Do not lift the handle when the roller reverses;
3.为了减少粘锅现象,在进料斗时,优先顺序为砂砾—水泥—砂或砂—水泥—石;
3. In order to reduce the phenomenon of boiler sticking, the priority of feeding hopper is gravel cement sand or sand cement stone;
4.加料时及时加水,缩短搅拌时间,减少粉尘;
4. Add water in time when feeding, shorten mixing time and reduce dust;
5.当料斗升起时,任何人不得在料斗下停留或通过;当必须在料斗下进行维修时,料斗应用链固定。
5. When the hopper is raised, no one is allowed to stay or pass under the hopper; when maintenance must be carried out under the hopper, the hopper shall be fixed with safety chain.
6.非操作人员不得翻转控制手柄;机器不运转时,一定要用钩把机器固定好;
6. Non operators shall not turn over the control handle; when the machine is not running, it must be fixed with a safety hook;
7.注意电器的,经常检查接地是否良好,防止电机受潮,防止电器元件、电线的损坏;
7. Pay attention to the safety of electrical appliances, regularly check whether the grounding is good, prevent the motor from getting damp, and prevent the damage of electrical components and wires;
8.断电时,用曲柄摇撼减速机带板,将筒内物料排出;
8. When the power is cut off, shake the belt plate of the reducer with the crank to discharge the materials in the barrel;
9.停车时,必须放下四个支撑脚管来支撑机器的重量;
9. When parking, four support legs must be put down to support the weight of the machine;
三、混凝土搅拌机完成工作的要求
3、 Requirements for completion of concrete mixer
1.停机前,应将一定数量的石子和水放入机器中,搅拌5 ~ 10分钟,然后释放,以气缸内的积存,避免粘在水箱上;
1. Before shutdown, a certain amount of stones and water shall be put into the machine, stirred for 5 to 10 minutes, and then released to eliminate the accumulation in the cylinder and avoid sticking to the water tank;
2.混凝土上的积灰和粘结剂;
2. Remove the ash and binder on the concrete;
3.将料斗置于运输位置,悬挂链;控制手柄用钩固定;
3. Place the hopper in the transportation position and hang the safety chain; fix the control handle with the safety hook;
4.切断电源,锁好电箱;
4. Cut off the power supply and lock the electric box;
5.在冰冻季节,将供水系统的所有积水全部排放;
5. In the freezing season, discharge all the accumulated water in the water supply system;
6.在每个润滑点加注必要的润滑油。
6. Add necessary lubricating oil at each lubricating point.
以上是中科混凝土搅拌机厂家为大家介绍的相关内容,想要了解更多内容,欢迎访问网站:https://www.jfjiaobanche.com
The above is the relevant content introduced by the concrete mixer manufacturer of China Science and Technology Co., Ltd. for more information, please visit the website: https://www.jfjiaobanche.com