全自动搅拌车告诉大家夏季如何进行施工?

来源:https://www.jfjiaobanche.com 浏览:0发表时间:2021-05-04
现在施工队伍是在不断的扩大的,所以我们要加强相关的配合,更好的保证我们的施工质量的提高,所以需要全自动搅拌车厂家向我们提出建议,那么我们应该如何加强施工质量呢?
Now the construction team is constantly expanding, so we need to strengthen the relevant cooperation to better ensure the improvement of our construction quality, so we need to put forward suggestions to us from the fully automatic mixer manufacturer, so how should we strengthen the construction quality?
1、再进行浇注之前,需要对模板和钢筋上残留的污渍进行。要在混凝土初凝后,及时得到养护,用草包覆盖,并浇水养护,避免混凝土表面水分蒸发过快,使混凝土表面发生开裂。
1. Before pouring again, it is necessary to remove the residual stains on the formwork and reinforcement. After the initial setting of the concrete, it should be cured in time, covered with straw bags, and watered for curing, so as to avoid the rapid evaporation of water on the concrete surface and cracking of the concrete surface.
2、全自动搅拌车厂家告诉大家在施工的过程中要做到及时的观察施工质量,这样才能及时配合做好混凝土配合比和坍落度的调整工作,让我们的施工安 全得到更好的保证。
2. The full-automatic mixer manufacturer tells us that we should observe the construction quality in time in the process of construction, so as to timely cooperate with the adjustment of concrete mix proportion and slump, so as to better guarantee our construction safety.
               全自动搅拌车厂家
3、当遇到,项目部应成立高温施工紧急情况应急领导小组,负责应急救援工作的指挥、协调工作,由项目经理担任领导小组组长。
3. In case of emergency, the project department shall set up an emergency leading group for high temperature construction, which shall be responsible for the command and coordination of emergency rescue work, with the project manager as the leader of the leading group.
4、夏季高温到来之前,组织有关人员按照方案要求进行技术交底,提出夏季高温计划,为施工提供技术准备。
4. Before the arrival of summer high temperature, organize relevant personnel to carry out technical disclosure according to the scheme requirements, put forward summer high temperature plan, and provide technical preparation for construction.
全自动搅拌车厂家要告诉大家的相关的问题,希望大家要做到合理的调整,这样才能保证我们的施工安 全,让我们的施工效果更加的具有保障。
Automatic mixer manufacturers to tell you the relevant problems, I hope you want to do reasonable adjustment, so as to ensure our construction safety, so that our construction effect is more guaranteed.