小型混凝土搅拌车如何清理土渣?
因为混凝土的广泛使用,所以在很多工程中经常会使用小型混凝土搅拌车,虽然体积不大,但是在运输混凝土的时候还是会选择它。在运输途中随时搅拌着混凝土,很多人觉得上面的土渣很难清理,那么如何清理土渣呢?
Because of the wide use of concrete, so in many projects often use small concrete mixer, although the volume is not large, but it will be selected when transporting concrete. During transportation, the concrete is mixed at any time. Many people think it is difficult to clean up the soil slag on it. So how to clean up the soil slag?
一、准备好紧急驱动软管,将小型混凝土搅拌车熄火,卸下液压马达上的高压油管接头。将救援车熄火,将其液压马达的高压油管卸下,并与故障车上的对应接头用紧急驱动软管相连。发动救援车,将其操纵手柄拨出料位置,故障车内的混凝土即被排出。紧急驱动完毕后,将驱动软管卸下,并恢复两车原状。
1、 Prepare the emergency drive hose, turn off the small concrete mixer, and remove the high pressure oil pipe connector on the hydraulic motor. Turn off the fire of the rescue vehicle, remove the high-pressure oil pipe of its hydraulic motor, and connect it with the corresponding connector on the fault vehicle with emergency drive hose. Start the rescue vehicle, turn its control handle to the discharging position, and the concrete in the fault vehicle will be discharged. After the emergency drive, remove the drive hose and restore the original state of the two vehicles.
二、在托轮和滚道之间放入木楔,以控制小型混凝土搅拌车搅拌筒的旋转;将发动机熄火,拆松液压马达的一根高压油管,搅拌筒可自由旋转,控制搅拌筒的旋转,使维修孔转到下部,然后打开维修孔,清理出筒内混凝土。此时一定要注意,混凝土排出完毕后,恢复搅拌车原状。
2、 A wooden wedge is placed between the supporting wheel and the raceway to control the rotation of the mixing drum of the small concrete mixer truck; the engine is turned off, and a high-pressure oil pipe of the hydraulic motor is loosened, and the mixing drum can rotate freely to control the rotation of the mixing drum, so that the maintenance hole is turned to the lower part, and then the maintenance hole is opened to clean out the concrete in the cylinder. At this time, we must pay attention to safety, after the concrete discharge, restore the original state of the mixer truck.
小型混凝土搅拌车在清理土渣的时候不妨尝试上面介绍的两种方法,在使用过程中希望大家能够一次性清理干净车上所有的土渣,防止残留。影响着下一批混凝土的性能。
Small concrete mixer in the cleaning of soil slag may try the above two methods, in the process of use, I hope you can clean all the soil slag on the truck at one time to prevent residue. It affects the performance of the next batch of concrete.